When two people move or work at the same time, ask how quickly the distance between them changes or how much work they finish together in one unit of time. Combining rates means combining progress, not simply combining the times given in the question.
Moving toward each other closes a gap
Two walkers start 21 kilometers apart and walk toward each other. One walks at 4 kilometers per hour and the other at 3 kilometers per hour. In one hour, one removes 4 kilometers from the gap and the other removes 3. Together they close 7 kilometers each hour.
The time until they meet is hours. During those hours, they travel 12 and 9 kilometers. Their distances add to the original 21-kilometer gap, which checks the answer.
This addition applies because both movements shrink the same gap. If they walk away from each other, the sum describes how quickly the gap grows instead.
A straight line shows the remaining gap falling from 21 kilometers at zero hours to zero at 3 hours.
Both walkers shrink the same gap: 21 kilometers becomes zero after 3 hours at a combined 7 kilometers per hour.
Describe this figure
A straight line shows the remaining gap falling from 21 kilometers at zero hours to zero at 3 hours.
Marked points: Start: filled marker at (0, 21); Meet: filled marker at (3, 0).
Example: catching someone ahead
A runner is 600 meters ahead of another runner. The runner behind moves at 250 meters per minute; the runner ahead moves at 200 meters per minute. Both continue in the same direction.
Each minute, the faster runner gains meters. Closing the 600-meter gap therefore takes minutes. In that time, the runner behind travels 3,000 meters and the other travels 2,400. The difference, 600 meters, exactly makes up the head start.
Adding the speeds would not describe this situation. Most of the faster runner's movement merely keeps pace with the other runner; only the extra 50 meters per minute closes the gap. If the runner behind were no faster, there would be no catch-up under these assumptions.
Work together by adding fractions of a job
Suppose one machine fills a tank in 6 hours and another fills it in 3 hours. The first completes of the tank per hour; the second completes per hour. Together they complete
of the tank each hour. Filling one whole tank takes hours.
Adding 6 and 3 gives a sum of solo completion times, not the time needed together. The combined time should be shorter than 3 hours, because the faster machine is getting help. That simple check catches many wrong answers.
This model assumes both machines maintain their rates, start together, and do not interfere with each other. If one starts later, split the work into stages.
Example: account for an early start
A worker can paint a fence in 8 hours. After working alone for 2 hours, the worker has finished of the fence. A second worker, whose solo time is also 8 hours, then joins.
The remaining work is of the fence. Their combined rate is fence per hour, so the remaining time is hours. The total elapsed time is hours. Be clear whether the question asks for time after joining or time since the work began.
Try it yourself
Two cyclists ride toward each other from places 54 kilometers apart at 12 and 15 kilometers per hour. How long until they meet? Separately, two identical pumps each fill a tank in 10 hours. How long together?
Answer: The cyclists close kilometers per hour, so they meet in 2 hours. The pumps fill of a tank per hour, so they need 5 hours.
What to remember
For motion, describe how the gap changes. For work, convert solo times into fractions of a job per unit time. Combine those rates, then divide the required distance or remaining work by the combined rate.